Optimasi Penjadwalan Tenaga Kesehatan di Puskesmas Teja Kabupaten Pamekasan Menggunakan Solver Excel
Abstract
The Teja Community Health Center, Pamekasan Regency, is experiencing problems in managing the scheduling of health workers (Doctors, Nurses and Midwives) optimally, which can result in an imbalance in workload and high idle time (periods of not serving patients). This research aims to optimize the scheduling of health workers at the Teja Community Health Center using Solver Excel. This research uses quantitative methods with a descriptive analitycal approach, with data on the number of health workers and maximum working hours collected and analyzed. A linear scheduling model was created using Solver Excel to minimize idle time for health workers. The research results show that optimal scheduling with appropriate assignments on admission and non-admission days, as well as an even distribution of workload can increase operational efficiency and reduce idle time, thereby increasing the efficiency of using health workers. The research results also include information about the number of 2 doctors, with a total of 48.5 working hours, 28 nurses, with working hours of 776 hours, and the number of 30 midwives, with working hours of 388 hours. The optimization value obtained shows that the total number of doctors available per day is 1, the total number of nurses available per day is 16, and the total number of midwives available per day is 8. This research contributes to improving the operational efficiency of the Teja Community Health Center and the quality of health services. Optimal scheduling can help health workers work more efficiently and reduce fatigue.
Keywords
Full Text:
PDF (Bahasa Indonesia)References
R. Almahuwanah, H. Cipta, dan S. Dur, “Penjadwalan Tenaga Kerja Pada Hotel Menara Lexus Menggunakan Metode Algoritma Genetika,” Jurnal Riset Rumpun Matematika Dan Ilmu Pengetahuan Alam (JURRIMIPA), vol. 3, no. 1, pp. 424–436, 2024.
M. Widyaningsih, “Optimasi Penjadwalan Jumlah Perawat Dengan Menggunakan Linear Programming,” Jurnal Bisnis & Manajemen, vol. 18, no. 2, pp. 39–56, 2018.
A. M. Tanurahardja dan O. Gondokusumo, “Penjadwalan Proyek Gedung Sekolah Di Surabaya Menggunakan Optimasi Time-Cost Trade-Off Dengan Discounted Cash Flow,” JMTS: Jurnal Mitra Teknik Sipil, vol. 5, no. 1, pp. 195–208, 2022.
W. Priatna, J. Warta, dan D. Sulistiyo, “Implementasi Algoritma Genetika Untuk Aplikasi Penjadwalan Sistem Kerja Shift,” Techno.Com, vol. 22, no. 1, pp. 235–246, 2023
P. Sehati, “SDM Keseharan dan Jam Pelayanan Puskesmas Teja Kabupaten Pamekasan,” Upt Puskesmas Teja Accessed: May 15, 2024. [Online]. Available: https://pkmteja.pamekasankab.go.id.
S. M. Rezkia, “Fungsi Solver di Excel, Solusi Untuk Masalah Kompleks.” Accessed: Jun. 13, 2024. [Online]. Available: Https://Dqlab.Id/Fungsi-Solver-Di-Excel-Solusi-Untuk-Masalah-Kompleks
K. Ahmed, “How to Use The Solver Feature In Excel.” Accessed: Jun. 13, 2024. [Online]. Available: Https://Www.Exceldemy.Com/Learn-Excel/Solver/Examples/
A. Chandra dan N. Y. Hidayah, “Perencanaan Dan Jadwal Induk Produksi Keripik Cabe Menggunakan Metode Linear Programming Dan Hax dan Meal,” JIME (Journal Of Industrial And Manufacture Engineering), vol. 8, no. 1, pp. 2549–6336, 2024.
Wikipedia, “Tenaga Kesehatan,” Wikipedia. Accessed: May 15, 2024. [Online]. Available: https://id.wikipedia.org/wiki/Tenaga_kesehatan.
A. P. Farahdiansari dan M. Budi, “Penggunaan ILP untuk Vehicle Routing Problem pada Penjadwalan Distribusi Barang,” Jurnal Teknik Industri, vol. 7, no. 1, pp. 48–53, 2021.
D. Asmarajati, M. F. Asnawi, dan R. D. Akmal, “Implementasi Algoritma Genetika pada Penjadwalan Sistem Informasi Xyz Tv,” Riau Journal of Computer Science, vol. 06, no. 01, pp. 12–22, 2020.
S. A. Lythio dan O. Gondokusumo, “Penerapan Line of Balance Dengan Target Waktu Penyelesaian Proyek Untuk Optimasi Penjadwalan Proyek Rumah Tinggal,” JMTS: Jurnal Mitra Teknik Sipil, vol. 5, no. 4, pp. 845–856, 2022.
M. Hafiz Et Al., “Algoritma Genetika Penjadwalan Mesin Bertipe Sistem Produksi Untuk Meminimalkan Waktu Proses Produksi,” Jurnal Ilmu Komputer Dan Pendidikan, vol. 1, no. 2, pp. 288–295, 2023.
A. M. Tanurahardja dan O. Gondokusumo, “Penjadwalan Proyek Gedung Sekolah Di Surabaya Menggunakan Optimasi Time-Cost Trade-Off Dengan Discounted Cash Flow,” JMTS: Jurnal Mitra Teknik Sipil, vol. 5, no. 1, pp. 195–208, 2022.
A. R. A. Djamaris, “Pemanfaatan Excel-Solver Untuk Pengambilan Keputusan,” Kuningan, Jan. 2018.
Article metrics
Abstract views : 23 | views : 7Refbacks
- There are currently no refbacks.